Hindustan Zinc signs power delivery agreement with Serentica Renewables Illustrative image – not actual.

Hindustan Zinc has signed a power delivery agreement (PDA) with Serentica Renewables to increase its renewable energy capacity from 450 MW to 530 MW, raising its total renewable energy contribution to over 70 percent of its power requirement.

This first-of-its-kind round-the-clock renewable PDA ensures a minimum supply of 315 MW uninterrupted power in every 15-minute time block. The project will involve building new solar, wind, and energy storage infrastructure across high-resource locations in India and is expected to be fully operational by 2027.

Developed under a captive structure, the project aims to reduce Hindustan Zinc’s dependence on conventional energy sources, offering reliable and seamless power through advanced energy storage systems and market mechanisms. This PDA marks a major shift in industrial power procurement, moving from conventional RTC models to a Time Block-Based firm Renewable Energy solution.

The agreement guarantees a precisely scheduled and dispatchable power supply, revolutionising sustainable energy usage in the industry.

 

← All latest storiesBack to top →