HGML to scale up pilot bio-reactor project to commercial levelIllustrative image – not actual.

Hutti Gold Mines (HGML), the country's sole gold producer, has plans to scale up its bio-reactor set up at one of its mines, as a pilot venture, into commercial level.

 

The 100 kg bio-reactor, the first in the country, has been set up at G R Halli, where HGML has opened a new mine. The reactor has been set up in technological tie-up with the Indian Institute of Science and a funding of Rs.85 lakh from the Department of Biotechnology. The plant was put up by Engineers India.

 

The bio-reactor has shown that HGML can recover over 80-85 per cent of gold from the ore against 40-50 per cent from other methods. The reactor uses engineered bacteria to treat gold embedded in refractory or sulphidic ores.

 

HGML has tentatively identified Ajjanahalli, which is estimated to bear at least 10 lakh tonnes of refractory ore, to house the proposed full-scale reactor. In the next 2 months, it expects to build up some 100 tonnes of refractory ore to prepare 10 tonnes of concentrate as part of the scaling up process.

 

According to HGML Chairman & Managing Director, Mr K L Negi, The exercise might cost Rs.8-10 crore, of which, the Centre is expected to bear 50 per cent.

 

For HGML, which currently produces about 2.4 tonnes of gold, bio-treatment could be highly cost-effective.

 

The company handles 1,500 tonnes of non-refractory ore where gold occurs freely.

 

According to reports, bio-treatment is in practice in the mines in Australia, South Africa, Brazil, Peru and China, with Ghana's Ashanti claiming the world's biggest gold bio-reactor.

← All latest storiesBack to top →