Illustrative image – not actual.
H G Infra Engineering (HGIEL) has received the appointed date as 7 November 2020 from the National Highways Authority of India (NHAI).
The scope of work involves construction of eight-lane, access-controlled expressway starting near the start of ROB near Junction with MDR-1 (Baonali-Jhalai road) (ch 214.260 to 247.310) section of Delhi-Vadodara Greenfield Alignment (NH-148N) on EPC mode under Bharatmala Pariyojana in Rajashthan. The length of the road project is 33.05 km.
The cost of the project is Rs 880.11 crore to be completed in two years.
