Illustrative image – not actual.HG Infra Engineering has been declared as the lowest (L1) bidder for a new hybrid annuity project (HAM) by the National Highways Authority of India (NHAI) in the state of Haryana.
The scope of work involves upgradation of four-lane of Rewari-Ateli Mandi section of NH-11 from 11.780 km at Rewari to 43.445 km near Ateli Mandi (designed length 30.45 km) as feeder route.
The length of the road to be constructed is 31 km. The work will entail an investment of Rs 580 crore. The operation and maintenance cost of the project in the first year will be Rs six crore. The construction period of the project is two years with an operation period of 15 years.
