Illustrative image – not actual.HG Infra Engineering has been declared the successful bidder by REC Power Development and Consultancy (RECPDCL) for developing an inter-state transmission system in Jharkhand.
To be executed under a build, own, operate and transfer (BOOT) model, as part of the WR–ER Inter-Regional Network Expansion Scheme – Part C , the contract involves the establishment of transmission infrastructure aimed at strengthening inter-regional power flow between the Western and Eastern regions of India. The execution period for the project is 30 months, during which the developer will also maintain the transmission system before transferring it as per BOOT terms. The quoted transmission charges for the project are Rs 1,145.34 million per year.
The project is part of India’s broader efforts to enhance grid reliability, improve interstate power transfer capacity, and support rising electricity demand driven by industrial growth, renewable energy integration, and urbanisation. Once completed, the project is expected to significantly improve transmission efficiency and strengthen the national power grid’s connectivity between key regions.
