Illustrative image – not actual.
HG Infra Engineering has been declared as the qualified bidder by NTPC Vidyut Vyapar Nigam.
The work comprises for 185 MW/370 MWh out of the project of tariff-based setting up of 500 MW/1000 MWh standalone battery energy storage systems (BESS) in India with viability gap funding support as per the terms and conditions of the request for selection (RfS). The tariff rate is Rs 2,38,000 per MW/ per month.
The contract is to be executed in 1.5 years.
