Illustrative image – not actual.HG Infra has been declared the lowest (L1) bidder for a new HAM project by the National Highways Authority of India (NHAI).
The scope of work involves construction of the proposed Narnaul Bypass (design length 24.0 km)-Ateli Mandi to Narnaul section of NH-11 from 43.445 km to 56.900 km (design length 14.0 km) as an Economic-Corridor Feeder route in the state of Haryana.
The project worth Rs 765.50 crore will be executed in a period of 910 days. The 14 km long road project has operation period of 15 years with operation and maintenance (O&M) cost of Rs five crore in the first year.
