Illustrative image – not actual.HEG has achieved financial closure for its graphite electrode capacity expansion project. The company has tied up loans worth Rs.314 crore towards funding its project with 60 per cent of these being domestic term loans at an average cost of 6.88 per cent. The remainder has been raised through foreign borrowings at an average interest rate of 6.72 per cent.
HEC is expanding the graphite electrode manufacturing capacity at its Mandideep plant in Raisen district of Madhya Pradesh from 30,000 tpa to 52,000 tpa. The project is expected to be commissioned by December 2005.
