HCC, Sadbhav Engineering bag Karnataka road projectIllustrative image – not actual.

The Karnataka state government has awarded the 191 km four-lane Hattigudur-Bidar highway project in the state, to Hindustan Construction Company, jointly along with Sadbhav Engineering.

 

The project, which is estimated to be completed in 48 months, will involve widening and strengthening the state highway, setting up flexible pavement foundation, bituminous surfacing and shoulder work, reconstructing a bridge, cross drainage and side drains. The project is being funded by the World Bank.

 

HCC has recently completed a 16.2 km stretch of the Mumbai-Pune expressway. It is presently executing the Mehsana-Palanpur highway in Gujarat in joint venture with Malaysia-based Pati Company. HCC is also involved in the 3.9 km long, eight-lane, cable-stayed Bandra-Worli sea link bridge project in Mumbai.

← All latest storiesBack to top →