HCC JV bags Rs 987 crore contract to build rail-cum-road bridgeIllustrative image – not actual.

Hindustan Construction Company (HCC) in JV with DSD Brouckenbau GmbH, Germany and VNR Infrastructures Ltd has received Rs 987 crore order from Northeast Frontier Railway to construct the Bogibeel rail-cum-road bridge over river Brahmaputra near Dibrugarh, Assam. HCC share in the order is 51 per cent, DSD Brouckenbau 20 per cent and VNR Infrastructures 29 per cent.

The bridge will be a double decked bridge having two railway tracks on the lower deck and a three-lane road on the upper deck. The road level will be 10.5 m above the railway line. The total length of the bridge will be 4.315 kms.

Related Links:
Project profile

← All latest storiesBack to top →