Illustrative image – not actual.Hindustan Construction Co has been awarded two hydropower projects by National Hydroelectric Power Corporation . The projects are Uri –II Hydroelectric Project in Jammu & Kashmir and the Chamera Hydroelectric Project (Stage III) in Himachal Pradesh.
HCC's scope of work for the Uri-II project comprises construction of dam, underground power house of 240 MW, head and tail race tunnels, diversion tunnels, surge shaft, pressure shaft. The contract is valued at Rs.574.99 crore and the period of completion is 48 months.
The Chamera III project is located in Chamba district of Himachal Pradesh on the banks of the river Ravi. HCC will construct the dam, underground power houses (3x77 MW), diversion tunnel, intake tunnels, underground de-silting chambers, head race tunnel, surge shaft, pressure shaft and tail race tunnel. The project, valued at Rs.504.87 crore, is scheduled for completion in 52 months.
HCC was also involved in the earlier stages of the Chamera project in 1994.
