Illustrative image – not actual.The Haryana Government is considering six-laning of the 78.88 km on NH-10 passing through Hisar. Similarly, four-laning of the Gurgaon-Faridabad road on a Build-Operate-Transfer (BOT) basis is under consideration.
And to ease congestion of traffic between Faridabad and Delhi, a six-lane elevated highway is to be constructed at a cost of Rs. 2.67 billion on NH-2 at Badarpur. The Zirakpur-Panchkula-Kalka highway will be four-laned. The government has spent Rs.13.37 billion for construction of the new 205-km-long roads and repair, strengthening and carpeting of roads measuring 9,195 km.
