Haryana advances Saraswati restoration plan with barrage, groundwater managementIllustrative image – not actual.

The Haryana government has approved a proposal to engage IIT Roorkee for preparing a detailed scientific report on linking the Tons basin with the Saraswati basin and developing a sustainable groundwater management plan.

The proposed study will evaluate the feasibility of diverting water from the glacier-fed Tons River and seasonal streams, while assessing water availability, quality and ecological requirements. The government is also accelerating ongoing Saraswati revival projects, including works at Adi Badri and the construction of the Saraswati barrage. Excavation work for the proposed 350-acre Saraswati reservoir has reached a significant milestone, with around 10 lakh cusecs of earth removed. The state has also directed strict monitoring to prevent untreated sewage discharge into the river.

The integrated development plan for the Saraswati corridor includes riverfront facilities, ghats, bridges, beautification projects and cultural infrastructure.

 

← All latest storiesBack to top →