Illustrative image – not actual.Hardy Exploration & Production (India) Inc is planning to carry out the following petroleum operations in the CY-OS/2 block, offshore Pondicherry, East Coast of India:
- Re-entry in one existing well in the block
- Testing of potential hydrocarbon bearing horizons
In the event of positive outcome of
testing operations, further drilling operations (upto 2 exploration wells) are
envisaged. The re-entry and testing operations are proposed to be started by
November 2001.
The company has issued a notice for
pre-qualification of offshore contractors for the following equipment /
services for the block:
- Drilling rig: Capable of drilling in water
depth of 30-50 metres, 5000 metres drilling depth capacity.
- Anchor handling-supply-cum-towing vessel: Minimum 4500-6000
BHP, minimum 50T Bollard Pull, adequate capacity to carry drilling
supplies.
- Well logging (including LWD, PLT,
perforation, CBL, well stimulation): Equipment and services
- Well testing (DST): Equipment and services
Expressions of interest may be
submitted by 28 September 2001 to:
Contracts Manager,
Hardy Exploration & Production
(India) Inc.
(TR-A Project),
Floor 5, Westminster Building,
108 Dr.Radhakrishna Salai,
Mylapore,
Chennai – 600 004
Ph: 91-44-847 1979-1990
Fax: 91-44-847 1064
