Illustrative image – not actual.
H G Infra Engineering has received a letter of award (LoA) from the National Highways Authority of India (NHAI) for a road project.
The scope of work envisages six-laning with access control from 29.435 km to 74.168 km of Neelmangala-Tumkur including Tumkur bypass section of NH-48 (old NH-4) in the state of Karnataka on EPC mode under Bharatmala Pariyojana. The total road length is 44.733 km.
The bid project cost is Rs 844.11 crore with a completion period of three years.
