Illustrative image – not actual.H G Infra Engineering has received letter of award (LoA) from Modern Road Makers, a subsidiary of IRB Infrastructure Developers.
The scope of work involves six-laning of Hapur bypass to Moradabad section, including Hapur bypass 50.00 km (design ch 50.00 km) to 148.77 km (design ch 149.867 km) (excluding Hastinapur wild life section) of NH 24 (new NH-9) in the state of Uttar Pradesh.
The project at a cost of Rs 1,172.291 crore will be implemented on EPC basis. It will be completed in two years from the appointed date. The length of the road will be 79.867 km.
