H G Infra Engineering receives appointed date for road projectIllustrative image – not actual.

H G Infra Engineering (HGIEL) has received the letter of appointed date from Adani Road Transport which is 17 August 2020.

The scope of work involves four-laning of NH-63 from Mancherial (design ch 0.000/ existing 251.900 km) to Repallewada (design ch 42.000/ existing 288.510 km) (design length - 42 km) in the state of Telangana under NHPD Phase-IV under NH(O) on EPC mode.

The work will be completed at a cost of Rs 950.79 crore with a completion period of 18 months.

 

← All latest storiesBack to top →