Illustrative image – not actual.H G Infra Engineering has incorporated a new special purpose vehicle (SPV) H G Ateli Narnaul for construction of the proposed Narnaul Bypass.
The bypass (design length 24.0 km)-Ateli Mandi to Narnaul section of NH-11 from 43.445 km to 56.900 km (design length - 14.0 km) as an Economic Corridor Feeder route in the state of Haryana on hybrid annuity mode (HAM).
The project will entail an investment of Rs 952.11 crore to be completed in a period of 910 days. The 14 km long road project has operation period of 15 years with first year operation and maintenance cost of Rs five crore.
