Illustrative image – not actual.On 4 March 2014, Akhilesh Yadav, Chief Minister of Uttar Pradesh, inaugurated the Srinagar hydroelectric power project of GVK Power & Infrastructure, in Uttarakhand.
The project, with 330 MW capacity, has been developed across river Alaknanda in the Tehri Garhwal and Pauri Garhwal districts of Uttarakhand. The company has invested Rs 4,192 crore in the project.
Of the total power generated from the project, 88 per cent will go to Uttar Pradesh Power Corporation (UPPCL), as per the Power Purchase Agreement (PPA). The remaining 12 per cent is expected to be allotted to the government of Uttarakhand free of cost.
The project, which is 248 mtr long, is a 90 mtr high (from the deepest foundation level) dam. It is expected to utilise the net head of around 66 mtr between the diversion dam and the power house to generate electricity. The water conductor system consists of two head race tunnels, RCC troughs, power channel and penstocks.
Related Link:
Project profile
