GVK Power lowest bidder for Gujarat road projectIllustrative image – not actual.

GVK Power & Infrastructure based in Hyderabad has emerged as the preferred bidder for a road project in Gujarat.

The project is for six-laning of the existing three lanes of the 101.9 km long Bagodara-Wataman-Tarapur-Vasad Road on BOT basis. The project entails an investment of about Rs 1,000 crore. The concession period for the project is 27 years including a construction period of 2.5 years.

On the completion of the concession period, the project is to be handed over to Gujarat State Road Development Corporation.

Related Links:
Project profile

← All latest storiesBack to top →