Illustrative image – not actual.GVK Bagodara Vasad Expressway, a subsidiary of GVK Power and Infrastructure has signed a concession agreement with the Gujarat State Road Development Corporation (GSRDC).
The agreement with GSRDC is for six laning of the existing three lanes of the Bagodara-Wataman-Tarapur-Vasad road project in Gujarat. The work entails improvement of a stretch of the SH-8, from 0 to 109 km on BOT basis.
The concession agreement is for a period of 27 years including the construction period of 30 months.
Also See:
GVK to develop airports in Bali, Java (25-Jan-11)
Related Links:
Project profile
