Illustrative image – not actual.Mumbai International Airport has tied up with an IDBI Bank-led consortium of banks to raise Rs.4,000 crore for implementing the Rs.7,000 crore modernisation project over a period of 20 years.
MIAL plans to invest up to Rs.5,800 crore in seven years and the remaining Rs.1,200 crore will be invested in the next 13 years. The company will raise money from twelve banks, including IDBI and UTI Bank, at a rate of 215 basis points over the yield on the three-year government security. The loan facility will have a 17 year maturity with a seven year moratorium.
The modernisation of the Mumbai airport includes construction of a six-lane elevated highway from the Western Express Highway linking the airport terminal directly connecting with the Mass Rapid Transport System (MRTS). The airport is also expected to have a parallel second runway, additional exclusive terminal for domestic and international operations and a cargo terminal.
Netherlands Airports Consultants B V (NACO) and Singapore-based Changi Airport are helping MIAL planning improvement in operations and management of the airport.
Also See:
Mott MacDonald appointed technical advisor for Delhi airport (11-May-06)
Related Links:
Project
profile
mumdel2
