Illustrative image – not actual.Gurugram Railway Station is set to receive a direct road connectivity link with the Dwarka Expressway as part of a planned infrastructure upgrade aimed at easing traffic congestion and improving commuter access.
The Gurugram Metropolitan Development Authority (GMDA) is preparing to commission a detailed feasibility study to identify the most suitable alignment for the proposed road link. The study will assess key factors such as land availability, traffic load, construction cost, and overall technical feasibility before finalising the route. The initiative follows a recent review meeting in which Haryana government’s principal advisor on urban development, DS Dhesi, directed GMDA officials to expedite planning work for the project. The railway station is currently being upgraded under the Centre’s Amrit Bharat Station Scheme and handles over 100 trains daily, connecting multiple states across India. At present, commuters mainly depend on Railway Road to access the station, which frequently experiences severe congestion, particularly near the Daultabad railway overbridge.
The proposed direct link is expected to significantly reduce travel time, ease pressure on existing road infrastructure, and improve last-mile connectivity between the station and the expressway, supporting smoother passenger movement and better regional transport integration.
