Gujarat Power Policy
1.0
Introduction
1.1 Power is
the engine of growth of any developing economy. Consumption of electrical
energy is an universally accepted indicator of progress in the agricultural,
industrial and commercial sectors, as also of the well being of the people of
the State. No major economic activity can be sustained without adequate and
reliable supply of power. It plays a critical role in employment generation,
regional development and poverty eradication.
1.2 The Government of Gujarat has given highest priority
to the development of power sector. To give concrete shape to the above issue,
the Government has felt the need to come out with a 'Power Policy'. In October,
1991, the Government of India has made changes in the Electricity Supply Act
allowing private sector participation in the field of generation, transmission
and distribution of power. The State in its new 'Power Policy' proposes to
encourage private sector participation in the field of power-generation
transmission and distribution which till today was reserved for state public
sectors only. Further it will also facilitate setting up of captive power units
by different industrial units. Similarly, in the field of distribution of power
it seeks private sector participation which will make the distribution and
delivery system competitive and efficient. The State seeks to identify its
power system needs and the means to fulfill the same through a comprehensive
'Power System Master Plan'. The State will augment long term generation of
power by putting up large power plants which have been identified or are to be
identified by the 'Power System Master Plan'. For short term augmentation of
the State's power generation capacity it seeks to encourage setting up of
captive power capacity by industrial units; putting up of short gestation small
plants near the load distribution centre besides going for early commissioning
and synchronising of projects in the pipeline. In the transmission sector the
state power-grid will be maintained by Gujarat Electricity Board who will take
the help of private sector in augmenting the capacities of transmission grid.
It also seeks to encourage the use of non-conventional and renewable sources of
energy and energy conservation while taking care of environmental issues. It
also seeks to rationalise power tariff and duty through an Independent
Statutory Tariff Regulatory Commission. Policy will be closely monitored by a
high power committee.
1.3 The State of Gujarat came into being in the year
1960. The total installed generating capacity then was 315 MW. The State
receives 1244 MW of power as its share from Central Pool like Korba (360 MW),
Kawas (184 MW), Gandhar(185 MW), Kakrapar (125 MW), Vindhyachal (230 MW) and
Tarapur (160 MW). Among the major power plants in Gujarat are Ukai (850 MW),
Wanakbori (1260 MW), Utran (39 MW), Ahmedabad Electricity Company (510 MW),
Gandhinagar (660 MW), Dhuvaran (588 MW), Panandhro(140 MW), Sikka (240 MW) and
Kadana (120 MW). As on 30.09.1995, the total derated installed capacity in the
State was 6238 MW. It may be added here that in addition to this there is a
capacity of 1306 MW from captive generating sets put up by different Companies
within State. The State's per capita annual electricity consumption is 650 Kwh
compared to national average of 345 Kwh.
1.4 Projects
under different stages of Planning and Implementation
- GTEC (Gandhar) 655 MW
- Reliance, Sikka 500 MW
- Essar, Hazira 510 MW
- GMDC, Akrimota 250 MW
- GIPCL
I Baroda 160 MW
II Mangrol 250 MW 410 MW
- GPCL
I Kharsalia 125 MW
II Surkha 250 MW 375 MW
GEB Gandhinagar 210 MW
Wanakbori 210 MW 420 MW
- AEC 'C' Station 60 MW
- Panandhro expansion 75 MW
- Kadana 120 MW
Sardar Sarovar Project when
completed will generate 1400 MW hydro power, from which Gujarat will get 232 MW
of power as its share. There will be a further addition of 14 MW from mini and
micro hydel power stations based on Narmada canals.
1.5 Projects
under active consideration (totally 2161 MW)
- Small Thermal/Liquid fuel fired
- Power Plants (5x100 MW) 500 MW
- Coastal imported coal based
- Power stations (2x500 MW) 1000 MW
- Pipavav Gas/Naphtha Thermal
- Power Station 615 MW
- Upgradation of the 54 MW Power
- Plant at Dhuvaran to 100 MW
These projects when completed will
raise the installed capacity in the State by 5536 MW taking the total to 11774
MW. This will be over and above the captive power capacity, which in coming
years is expected to go up substantially.
1.6 In the
post-liberalisation era, Gujarat has been witnessing rapid industrial growth.
Investment of over Rs.1,00,000 crores is in the pipeline resulting in a quantum
jump in the demand for power. While the State must go all out to augment the
supply of power, one has to take note of the three basic constraints that the
State has to live with :
a) Constraint
of local fuel resources like lignite, coal and hydel.
b) Difficulties
in getting coal linkages for the power plants.
c)
Long distance from the coal pit-head.
Due to the difficulties in getting coal linkages and long
distance of coal haulage, the cost of coal in Gujarat comes to an average of
Rs.1436.5 per MT compared to Rs.710 per MT for Maharashtra, Rs.730 per MT for
Rajasthan and Rs.400 per MT for Madhya Pradesh. The State's option for hydel
resources is also limited.
1.7 The State
has tremendous geographical advantage for port based power plants using
imported coal or liquid fuel like LNG, Naphtha and natural gas. This potential
has remained largely unexploited till now. In building the future perspective
for power development in the State, this potential is going to play a very
important role.
1.8 As per the 15th Electric Power
Survey, the total installed capacity in the State by the year 2000 AD should be
11236 MW. Survey assumed a linear 5.7% power demand growth. Gujarat today is on
the threshold of an unprecedented industrial boom, exemplified by the fact that
Gujarat accounts for a quarter of all industrial approvals in the country. A
realistic approach to the power scenario should, therefore, be built on the
premise that the demand for power is slated to grow atleast at the rate of 10%
in the coming years. Looking to this, the State would be needing a minimum
installed capacity of 15,000 MW by the year 2000 AD.
2.0 Objectives
The objectives of the power policy or for that matter any
sectoral policy should subserve the overall goals of the State in economic
development. Basically, the goals that the State strives to achieve in economic
sphere are the rapid development of productive activities in order to create
sustainable employment opportunities and thereby reduce the level of poverty,
particularly prevailing in rural areas and among the people belonging to
Scheduled Castes and Scheduled Tribes and Other Backward Classes. It is well
recognised now that economic growth is a must in order to share the fruits of
development more equitably. In this view of the matter the power policy also
has to take into consideration the objectives set in the industrial policy and
other sectoral policies. Having regard to these aspects, the following would be
the objectives of the power policy of the State :
1.
To plan and build up adequate capacities in generation,
transmission and distribution of power through efficient and cost effective
means.
- To achieve optimum utilization of existing
equipments and assets through renovation and modernisation.
- To rationalize the tariff structure to ensure
reasonable rate of return to power utilities and generate surplus needed
for future investment.
- To improve delivery of services and achieve cost
effectiveness through technical , managerial and administrative
restructuring of the utilities.
- To achieve conservation of energy through
efficient utilization and demand side management, and minimising waste.
- To encourage generation of power through non-
conventional sources of energy.
3.0 Approach
3.1 The requirements of financial & managerial
resources for the growth in power sector are so vast that the State agencies by
themselves will not be able to cope with. The Government of Gujarat, therefore,
have decided to encourage and facilitate private sector participation in the
fields of generation, transmission and distribution of power supply.
3.2 The State's approach in this regard will be to
foster a transparent and competitive environment which will provide level
playing field both for private sector and for state sector. The private sector
participation will be encouraged in the field of generation, management of
existing generation system, setting up of transmission lines, transmission and
distribution of power in the manner as envisaged in the Government of India
guidelines. While achieving competitiveness will be the guiding principle, it
is envisaged that there are vast possibilities for co-operative, complementary
and participative ventures between private (both domestic and foreign) and
state sectors in developing the power sector. Specifically, the following steps
will be taken in this regard :
I.
Facilitate infrastructural linkages for early completion of
all power projects.
II.
Take advance action to identify project feasibilities, sites
and other preparatory steps to reduce gestation period.
3.3 An
important aspect of the new approach will be restructuring and optimizing the
operations of power utilities by adopting a "profit centre approach"
at power station level where increased autonomy with accountability will be
given to power station authorities.
4.0 Strategy
4.1Power
System Master Plan
It is intended to prepare a "Power System Master
Plan" which will address itself in a systematic manner to estimating the
load forecast, calculating the regionwise deficit and formulating ways of
bridging this gap. The Master Plan will, among other things, consider:
I. Supply and demand side management.
II. Identifying optimum new generation which takes into
account most suitable mix of various types of fuel for power plants.
III. Upgradation of existing transmission and distribution
system so as to reduce losses.
IV. Identifying new transmission and distribution systems to
be set-up.
V. The locational aspects to remove presently existing
regional imbalances in power availability.
VI. To achieve cost reduction in
generation and distribution of power.
VII. Feasibility of locating power plants outside the State
as well as purchasing power from other States.
VIII. Sourcing of funds.
4.1.1 The Power
System Master Plan shall be prepared by 30th June, 1996.
4.1.2 A Planning
and Monitoring Cell will be set up in the Energy & Petrochemicals
Department. This Cell will be responsible for the implementation of the Power
System Master Plan. This will also ensure speedy implementation of ongoing and
future projects and extend help in obtaining various clearances from different
authorities of the State Government.
4.2 Generation
4.2.1 As on today the generation of power is being carried
out by Gujarat Electricity Board (GEB) or State sector only. State's power
policy proposes to throw open the generation of power to private sector also.
The State will encourage healthy, competitive level playing by both State
sector enterprises and private sector companies in the field of generation.
Government of India has recently
waived the mandatory techno-economic clearance of Central Electricity Authority
(CEA) for project with capital cost upto Rs.400 crores. This is expected to cut
down the gestation period of the project.
4.2.2 The State would provide attractive returns to independent
power producers within the ambit of Government of India guidelines. Selection
of IPPs will follow competitive and transparent route. Power so produced by
IPPs will be purchased at levelised tariff at the bus-bar.
4.2.3 As the part of this privatisation policy, the State
has already thrown open the following
4 projects involving an installed capacity of 2490 MW for
open competitive bidding:
- Lignite based power project at Surka/Kharsaliya
375 MW
- Small Thermal/Liquid fuel fired power plants (5
x 100 MW) 500 MW
- Coastal imported coal based power stations (2 x
500 MW) 1000 MW
- Pipavav Gas/Naphtha Thermal Power Station 615 MW
4.2.4 In order to achieve 15000 MW of installed capacity by
the turn of the century, it will be necessary to plan for additional generation
capacity of about 3250 MW. However, with the State's policy of encouraging
setting up of captive plants by industries, actual gap may be smaller.
4.3 Early Completion and Commissioning of New Units
4.3.1 A major thrust area identified for augmenting
generation is early completion and stabilisation of new units. Owing to factors
like multiplicity of commissioning agencies for main and auxiliary equipments,
failure of suppliers of equipment/auxiliary to adhere to the delivery schedules
and non-completion of projects in time, their synchronisation with the State
Grid has not been satisfactory. With the entry of private sector as independent
power producers, there will be a need to connect them to the State Grid and
synchronise their power plants most efficiently. Guidelines will be laid down
by the State Government to ensure that each individual unit takes
responsibility for the synchronisation, laying the transmission line, carrying
out their work in time so that the power is evacuated by the State Grid as soon
as it is made available.
4.4 Setting up of Small Power Plants
4.4.1 In order
to provide quick capacity addition to meet the minimum needs of the State Grid
it is proposed to build a number of small generating power plants at
sub-station level based on liquid fuels. The role of liquid fuel like Heavy
Petroleum Stock (HPS), Low Sulphur Heavy Stock (LSHS), Heavy furnace Oil (HFO),
LNG/Natural Gas, Naphtha has been recognised by the Government of India.
4.4.2 Because of the advantage of its long coastline
dotted with several ports, Gujarat offers site advantage for port-based liquid
fuel power plants both large and small. Liquid fuel is more eco-friendly
compared to lignite and coal. This strategy can be extended to put up small
plants at sub station level also. Besides, there will be other multiple
advantages such as low capital cost, reasonable operating cost, short gestation
period, reduction in T & D loss and generation of employment in rural
areas. The State Electricity Board has identified such sub-stations in Kutch,
Saurashtra and North Gujarat where small power plants can be put up near the
sub-station or inside the sub-station premises.
4.5 Renovation, Modernisation and Management of Existing Power
Plants
4.5.1 An important area which has not received sufficient
attention is the upkeep of existing plants. Some of the power stations in
Gujarat have outlived their original life span. In the absence of surplus generation
capacities, due attention has not been paid to scheduled maintenance,
renovation and modernisation of the existing plants. This has resulted in
unplanned outages and frequent breakdowns. As a result, availability factor and
the Plant Load Factor of a number of plants are below satisfactory level. It is
proposed to increase the operating efficiency of the existing plants through
introduction of professional management and renovation and modernisation
programmes. The process of renovation and modernisation involves substantial
investment. The State proposes to throw open the renovation and modernisation
of the existing plants to private sector (joint sector) participation which can
help in bringing in more efficient management practices leading to greater
availability of power.
4.5.2 In this, the first task is to identify critical
components in the plants that require immediate replacement and renovation.
Such renovation/extension programmes can extend the life by another 20-30 years
at a fraction of the cost of a new plant. By improving the efficiency and
utilisation of the plant, the Plant Load Factor can be increased to 75%. Nearly
5000 million additional units can be generated by this method alone in the
State. Government will encourage the renovation and modernisation of all plants
of State Electricity Board. For this purpose help of private sector will be
taken on case-to-case and merit basis.
4.5.3 Private
Sector will be allowed to operate/manage the plants wherever necessary. Such
participation by the private sector may follow the following routes:
a) Lease,
Rehabilitate, Operate and Transfer (LROT)
b) Joint
Asset Management with State Electricity Boards;
c) Sale of
existing plants to private sector or to any joint sector venture.
4.6 Captive Generation:
4.6.1 In the context of continuing gap between projected
generation and demand for power in the State, the State recognises the need for
captive generation of power by Industries. This will be encouraged by the State
as a means to augment the power supply. Captive generation will ease the burden
on distribution system and also make surplus power available for the State
Grid. Private industries including EOU's will be permitted to go for captive
generation upto 60 MW without any restriction. For higher captive capacity
decision will be taken by the State Government on a case to case basis.
4.6.2
Co-Generation
The co-generation combines the process of recovering steam
and power from the same single fuel source. After the power is generated the
waste heat from the exhaust is collected to generate steam. As a result, the
utilisation of energy improves from 30% - 35% to 70%. It also reduces the cost
of energy as the cost of power is shared between power generation and process
steam. The State will encourage the industries to generate steam through
co-generation. This will help waste heat recovery and lead to energy
efficiency. There will be no cap on the quantum of co-generation that can be
done by industry.
4.6.3 Gujarat Electricity Board will consider purchase of
surplus power from captive units on mutually agreed terms covering price,
timing, quantum and the period of purchase of power.
4.7 Non-Conventional Sources of Energy
4.7.1 The State realises the importance of renewable
sources of energy. The State shall endeavour to get the maximum benefit out of
the non-conventional and renewable sources of energy which are clean and
eco-friendly. The State today has an installed capacity of 64.52 MW wind power
generation at various locations like Lamba, Okha, Mandvi, Tuna, Thank and
Bamanbore. 16 new locations have been identified with a potential of 5000 MW of
power which have a favourable wind speed of 19 to 25 Km per hour. It is
intended to rationalise the incentive scheme for wind farms to attract more
private investors and also simplifying procedure for allotting government waste
land for above purpose.
4.7.2 Large areas of the State have solar insolation of
5.8-6.0 Kwh per sq.mt. per day. Vast tracts of land in Banaskantha, Kutch and
Saurashtra are ideally suited for tapping solar energy both for generation of
power and green house. It is proposed to encourage setting up of suitable solar
power stations in North Gujarat and Kutch/Saurashtra.
4.7.3 The State has 19 sugar mills which can generate 200
MW of power from the bagasse. There is also ample scope to generate fuel by
bio-generators, using paddy husk and other biomass that are available in the
State. State will provide suitable incentives to generate power from bagasse/paddy
husk/biomass/agricultural waste.
4.7.4 Gujarat
has a large urban population which is expected to cross 50% of the total
population by 2000 AD. The organic urban waste generated in the urban areas can
be used for generation of energy. This will not only augment scarce energy
resources but also go a long way in efficient disposal of the urban waste.
4.7.5 The State has a large coastline of 1600 Km. The
tidal wave altitude in Gujarat in many places reach nearly 6 metres. The
technologies for the efficient use of tidal wave is at developmental stage. The
State will encourage and provide adequate incentives for harnessing tidal
energy.
4.8 Other Sources of Energy
4.8.1 The State has large lignite deposits in North Gujarat at a depth of 600 Metres and below. It is difficult to mine the lignite economically. Technologies are available which will extract methane gas from the coal-bed and use this coal-bed methane for running power plants. State will encourage (private/joint sectors) entrepreneurs to take up coal-bed methane projects to harness this resource chiefly for power generation.
4.8.2 The scope for Mini/Micro Hydel Power Projects in
rivers and canals of Gujarat is rather limited. However, efforts will be made
to harness 100% of the potential by setting up of small Mini/Micro Hydel Power
Projects based on river/canal through private/state/joint sector participation.
4.9 Transmission
4.9.1 In order to provide efficiency in transmission,
there is a need to upgrade the transmission system. The State recognizes the
fact that for every Rupee invested in generation would entail an equivalent
amount to be invested in transmission and distribution system.
4.9.2 The State Power Grid will be maintained by the
Gujarat Electricity Board. In addition to its own generation, GEB will transmit
power of different generating companies for distribution to its own substation
in Gujarat or to the substations of private distribution companies. The
necessary wheeling charges will be paid by the distribution companies.
4.9.3 Gujarat
Electricity Board will accord higher investments in the transmission sector.
This will be done by availing funds from international and national funding
agencies and other institutional sources. A time bound programme will be laid
down by the Gujarat Electricity Board to minimise the transmission losses.
Transmission and distribution losses as estimated by GEB are about 20% compared
to all India loss of about 24%. This is around 15% in Philippines, 18% in
Thailand, 12% in South Korea and 9% in Taiwan.
4.9.4 Gujarat Electricity Board will allow private sector units to set up transmission lines and equipment for or on behalf of Gujarat Electricity Board. This will be done through a transparent bid and follow the Power System Master Plan of the State. Gujarat Electricity Board will pay to the company necessary rental for using their transmission line.
4.9.5 It is
proposed to achieve reduction in transmission losses by:-
I.
Increasing the voltage level wherever feasible.
II. Replacing
existing conductors by higher capacity conductors.
III.
Reducing the impedance in transmission lines by continued installation of
Static Capacitors to an optimum level.
IV. Decentralizing
generation at peak period by installation of small power plants as per clause
4.4.
V. Better
vigilance.
4.10 Distribution
4.10.1 Hitherto distribution of power has been the near
monopoly of Gujarat Electricity Board. The new power policy proposes to throw
open distribution of power to private sector and joint sectors also.
4.10.2 Distribution will be allowed on territorial basis to
electricity distributing companies for their respective franchise area. This
will be done through open competitive bidding process. The territories so
identified will have a proper mix of various classes of consumers. Gujarat
Electricity Board can participate in the equity of new companies entering the
field of distribution in terms of its existing assets such as distribution
lines and transformers. While handing over distribution to territorial
distributing companies adequate care will be taken to ensure that the
employment prospect of existing employees of GEB is not affected.
4.10.3 Each distribution centre will be identified as a
Profit Centre. The executive of the profit centre will be held accountable for
loss, theft as well as be given monetary incentive for better productivity and
better management. Use of electronic meters both for HT and LT power consumers
including single phase services will be resorted to. Use of low cost unmanned
substation will be progressively increased with the 'State-of-the-Art' SCADA
systems. In order to accurately account for the distribution losses, there is a
need to enforce the accountability of every unit of power that is generated.
4.10.4 All
distributing companies will be required to provide timely release of all
connections to various classes of consumers so that the consumers and the
industry do not suffer for want of electricity.
4.10.5 Village Level Helpers Scheme : Since it will be
imperative to ensure proper service backup at the village level, a system of
having a panel of helpers and linemen at the village level will be set up. They
will be trained by GEB/private distributing company and will have access to
tools and equipments of GEB/private distributing company. They will be employed
by the village panchayats as and when need arises.
5.0 Conservation
5.1 Energy Conservation
The State Government realises the importance of energy
conservation as a major thrust of the power policy. There is a need to have a
system that encourages energy conservation and provides disincentives for the
inefficient use of energy. In order to achieve this :
I.
Energy audit will be made compulsory for all major
industrial and large commercial establishments.
II.
Through suitable directives and fiscal
incentives/disincentives, the State Government will actively promote use of
energy efficient equipments like compressed fluorescent lamp, energy boosters,
etc.
III.
GEB will periodically carry out consumers' guidance and
education programme for energy conservation.
5.2 Government is acutely aware of the fact that the
horse power-based-tariff in agriculture sector has led to inefficient use of
energy by farmers. There is no incentive to install energy efficient pumpsets.
Adoption of improved irrigation methods such as sprinkler drip irrigation
system will reduce the requirement of energy as well as conserve the ground
water resources. The State will take comprehensive steps to induce farmers to
adopt energy and water conservation measures.
5.3 State is
also aware that flat horse power based agricultural tariff has led to high rate
of drawal of found water particularly in North Gujarat. During the coming years
to draw the same amount of water and maintain the same level of agricultural
production, the State will have to provide for higher and higher energy
consumption. This will require creation of additional generation capacities.
Government will lay stress on the recharging of ground water/aquifiers,
modernisation of existing irrigation system, incentives for better dry land
farming which will lead to optimum utilisation of State's resources and
reduction in energy consumption in the agriculture sector. While putting up new
power plants opportunity cost of such energy conservation measures will be
taken into account.
5.4 Environment
Conservation/Protective Measures
The State is heavily dependent on coal and lignite as a
prime fuel for its power plants. This dependence is likely to increase further
due to additions in generating capacity as envisaged in the policy. The
indigenous coal has a greater ash content. The lignite available in the State
has a sizable sulphur content. Government is deeply concerned about the
polluting effect of fly ash, sulphur dioxide, etc. Suitable steps will be taken
for the efficient use of fly ash. Government will encourage the use of
environment friendly technologies in power plants like electrostatic
precipitators, desulphurisation technologies and other technologies/equipments.
The State will encourage the power utilities to generate power from environment
friendly sources such as wind, solar, biogas, tidal energy, etc.
6.0 Fuel
6.1 In order to get adequate fuel linkages for the
future requirements of power generation, there has to be adequate and reliable
basket of fuel resources. Gujarat itself is poorly endowed with natural fuel
resources such as coal and hydro. There are small deposits of lignite available
in the State besides Natural Gas, which is available both off-shore and
on-shore in the western region.
6.2 The quantum of lignite or gas available are not
adequate to meet the power and fuel requirements of the State in the times to
come. Coal available from the eastern states of the country is of low calorific
value and high ash content. Transporting it across the country itself makes it
economically unviable. Moreover, adequate coal linkages are also not available
due to bottlenecks in transportation of coal. As a result, the State has no
option but to go for external supply of fuel resources such as LNG and imported
coal.
6.3 The State has a geographical advantage of having
large number of ports. This will facilitate the import of Liquefied Natural Gas
(LNG) which can be used for power generation. It can also be distributed as
fuel consumption in different industries. This will require setting up of LNG
terminals with gas distribution network. The State will actively encourage such
infrastructural development.
7.0 Tariff
Structure
7.1 The State recognizes the fact that there has to be a tariff rationalisation if private and foreign investments are to be forthcoming in the Power Sector. Tariff and duty rationalisation is also necessary if one has to improve the operational efficiency of GEB. On the other hand, grant of unrestrained freedom to fix the tariff by power utilities will lead to consumer interest being adversely affected. Looking to this, the Government proposes to :
I) Set up an Independent Statutory Power Tariff and
Regulatory Commission. The Commission will among other things call for relevant
data from power utility companies to fix the tariff. Care will be taken to see
that the cost of inefficiency of the public/electricity utilities will not be
passed on to the consumers
II) Revenue so generated for the utilities should be
adequate to sustain the operations and also to generate adequate surpluses for
proper maintenance of plant and machinery. Utilities should run on commercial
principle and earn adequate rate of return on capital investment
III) Tariff should be so
rationalised to take advantage of higher tariff for peak hour power consumption.
IV) Government is committed to continuance of subsidised
tariff for agricultural and socially obligatory activities like drinking water
and street lighting and lighting for urban and rural poor. These subsidies will
have to be explicit, quantified, reasonable and targetted. The Independent
Statutory Power Tariff Commission envisaged above shall take such subsidies
into consideration while determining the tariffs.
8.0 Other Matters
8.1 The State will have eventually a large number of power
utilities in the field of generation and distribution of power. It is proposed
to establish an association to be named as 'Gujarat Council of Power
Utilities'. This will be on autonomous body. It will provide a forum for
meeting of the power utilities.
8.2 The Council will also undertake the Research and
Development (R & D), Human Resource Development (HRD), and other related
matters such as need based training as felt by the power utilities. The Council
will act as an apex body for co-ordination amongst utilities as well as an
advisor to the functioning of the system grid.
8.3 The Gujarat Electricity Board has played a yeoman
role in providing adequate power and fulfilling many social obligations as
envisaged by the State during all these years. Gujarat has achieved nearly 100%
electrification. GEB has built up adequate generation capacity and
infrastructure which has made the State's per capita electric consumption one
of the highest in the country. Social obligations like subsidies to agriculture
sector, street light, drinking water, electricity connections to urban and
rural households has adversely affected the financial health of the GEB. In
order to restore the financial health of GEB, there is a need to restructure
GEB both financially and organisationally.
9.0 Implementation
Implementation of measures envisaged in this policy will be
looked after by a special implementation cell. The cell will ensure speedy
implementation of the power policy. The Government will set up a high level
committee headed by Chief Secretary to review the progress and implementation
of the power policy.