Gujarat plans six-lane high-speed corridorIllustrative image – not actual.

The Gujarat Government is planning to develop a high speed six lane road corridors between Bagodara in Ahmedabad district and Vasad in Anand district.

The state government has planned to convert the existing Bagodara-Vataman-Tarapur-Vasad road in to a six-lane one, considering the corridor's high density now which is expected to increase in the coming years.

The corridor has a total length of 101.90 km, beginning near Bagodara and moving through Vataman in Ahmedabad district and crossing Tarapur, Borsad, Adosar and Vasad in Anand before finally terminating at Vasad near the NH-8. The present two or three lane structure is being upgraded to make it two lane with paved shoulders of 2.5 mtrs covering a total carriage way of 12 mtrs. The entire corridor is expected to be upgraded to six lanes based on divided carriageway configuration. Besides, two toll plazas are also expected to be constructed on the corridor.

Presently, 30 mtrs width is available throughout the corridor and the state government is in process of acquiring sufficient road width of up to 60 mtrs, depending on availability, to accommodate divided carriageway facility in the six lane road.

The BOT project is estimated to cost around Rs 884 crore. The state government is likely to finalise the developer soon for which 18 bidders have submitted their bids. As the road has high frequency of vehicles, the state government will not be required to give viability gap fund to the companies.

← All latest storiesBack to top →