GRSE, NHIDCL signs MoU for double lane modular bridgesIllustrative image – not actual.

Garden Reach Shipbuilders & Engineers (GRSE), has signed a memorandum of understanding (MoU) with the National Highway Infrastructure Development Corporation (NHIDCL) for supply and launch of Double-Lane Class 70 modular steel and Bailey bridges.

The bridges have a carriageway width of 7.5 mtrs., allowing for the plying of two-way traffic in compliance with specifications laid down by the Ministry of Road Transport and Highways (MORTH). This agreement will enhance connectivity in critical forward areas along India's borders, facilitating seamless deployment of troop and equipment. The double-lane steel bridge developed by GRSE stands as the sole indigenous solution of its kind, in line with 'Aatmanirbhar Bharat Abhiyan'.

Under a similar MoU signed with the Border Roads Organization (BRO), GRSE has already supplied 44 nos. bridges Pan-India. The first such bridge was constructed at Flaghill, Dokalam, Sikkim at an altitude of 11,000 ft. under Project Swastik of the BRO, and was inaugurated in 2021.



 

← All latest storiesBack to top →