Illustrative image – not actual.The Greater Chennai Corporation (GCC) is set to establish a waste-to-energy plant and a scientific landfill at Keerapakkam to process 2,400 tonne of municipal solid waste daily from the Chennai-Tambaram-Avadi area.
The state government will provide Rs 350 crore for the project, which will be built on 75 acres of land allocated by the Tambaram Corporation, with 50 acres reserved for the landfill. The plant will have an incineration capacity of 2,400 tonne of waste per day and a power generation capacity of 45 MW. GCC will supply 1,800 tonne of segregated waste and 800 tonne of unsegregated waste daily to the plant. A private operator will manage the pre-processing of unsegregated waste before it's used for energy generation. The project will also include infrastructure for scientific disposal of residual waste.
The operator, under a 30-year agreement, will design, finance, build, and maintain the facility, with electricity generated being sold to Tamil Nadu Power Distribution Corporation.
