Illustrative image – not actual.
The Government of India is working on production-linked incentive (PLI) scheme 2.0 as well as looking at ways to ensure adequate raw material supply for the steel sector in 2024. The Minister of State (MoS) for Steel stated the government will ensure raw material supply for the steel industry and the focus will also be on promoting the use of scrap.
As per the Union minister Faggan Singh Kulaste, India has set a target of achieving an installed steel manufacturing capacity of 300 million tonne (MT) by 2030. Currently, the country has a capacity of around 161 MT. Further, efforts will be made to push for the use of artificial intelligence and new age technologies among the industry players to boost steel output while also look at reducing carbon emissions.
On production and demand for steel will grow significantly in 2024 on the back of infrastructure projects. The government is also engaged with several countries to explore alternate options for sourcing of coking coal. All steel players are increasing their capacities and to ensure ease of doing business, the government has been supporting them with clearances related to their projects.
The government is actively considering the inclusion of refractories in the upcoming PLI scheme 2.0 for steel and will align with the goal of doubling the country's steel production capacity to 300 MT by the year 2030. The Minister has urged the steel makers, including SAIL and RINL, to increase their product mix considering the growing needs of various sectors where steel is required.
The grouping, which represents the interest of the domestic steel industry, expects steel production to be in the range of 123-127 MT in FY24. The government had approved the PLI scheme 1.0 to boost the production of speciality steel that would help create additional capacity of around 25 MT.
