The Union power ministry has targeted to add 10,000 MW of fresh hydropower capacity during the X Plan period (2002-07). Till December 2005, cumulative capacity addition in the plan period was 5,380 MW (excluding hydropower projects of less than 25 MW.)

The envisaged fresh capacity in the X Plan would be the highest in any Plan period so far. To put it in perspective, fresh hydropower capacity addition in the VII, VIII and IX Plan period was 3828 MW, 2428 MW and 4538 MW, respectively.

India's Power Capacity
  As of 31-Dec (MW)   Addition in 2005
  2004 2005   MW % share
Thermal 80,136 82,042   1,906 47.5
Nuclear 2,720 3,310   590 14.7
Hydro 30,563 32,077   1,514 37.7
Total 113,419 117,430   4,010 100.0
Note: Figures based on capacity monitored by CEA

If the X Plan hydropower capacity addition target is honoured, it would be almost equal to the total hydropower capacity addition in the immediately preceding three plan periods.

Meanwhile, gross budgetory support to the hydropower sector is pegged at Rs.17,511 crore for the X Plan, compared with Rs.9,284 crore in the IX Plan period. The total Plan outlay for the hydropower sector, which was Rs.12,306 crore in the IX Plan was expanded to Rs.25,839 crore in the X Plan period.