Govt. plans Rs 15,000-cr VGF scheme to support 112 GWh energy storage capacityIllustrative image – not actual.

The Government of India is working on a new viability gap funding (VGF) scheme with an estimated outlay of Rs 15,000 crore to support the development of 112 GWh of energy storage capacity across the country.

The proposed programme includes 50 GWh of Battery Energy Storage Systems (BESS), 60 GWh of pumped storage projects, and two GWh of emerging energy storage technologies. The initiative is aimed at strengthening grid stability, supporting renewable energy integration, and addressing rising electricity demand, particularly during evening peak hours. A concept note prepared by the Ministry of Power has already been submitted for approval, and the draft scheme is currently under inter-ministerial consultation. The proposal is expected to play a critical role in achieving India’s target of 500 GW of non-fossil fuel capacity by 2030 by providing the storage infrastructure required to manage intermittent renewable power generation.

The scheme builds upon earlier VGF programmes which supported 43.2 GWh of battery storage capacity but did not include pumped hydro projects. According to the Central Electricity Authority (CEA), India’s energy storage requirement is projected to reach 235 GWh by 2029-30 and 888 GWh by 2035-36, highlighting the growing need for large-scale storage investments.

← All latest storiesBack to top →