Illustrative image – not actual.The Government of Tamil Nadu has invited post qualification of contractor and price bids from the contractors for construction of 4 no. of R.O.Bs, and 1 no. of RUB in the state.
The work envisages:
(a) Construction of R.O.B at the road branching from Km.0/4 of Uthukuli railway station to Sedarpalayam road to join at km 35/8 of Gobi-Dharapuram road. The project would be completed in a period of 18 months.
(b) Construction of RUB at km 2/10 of Shevapet-Elampillai road. The project would be completed in 18 months.
(c) Construction of ROB at km 5/10 of Perundurai Kangeyam road. The time for project completion is 18 months.
(d) Construction of ROB in between Kovilpatti and Nalli railway stations at Railway km.586/1-2 (Railway level crossing no.437) in Madurai Kanyakumari road (State Highways) at km.91/4 at Kovilpatti north. The time for completion is 18 months.
(e) Construction of ROB in between Kovilpatti and Kumarapuram railway station at railway railway km 588/9-10 (Railway level crossing no.440) in Madurai Kanyakumari road (State Highways) at km 94/2 at Kovilpatti (South). The project completion period is 18 months.
Last date
for submission: 07.02.2003
Further details may be obtained from:
The Superintending Engineer (H)
Project,-I
Madurai & Divisional Engineer (H)
Project-I, Division I
Madurai
