Government to formulate scheme to revive power projectsIllustrative image – not actual.

The government will soon offer a long-term financing scheme to revive stalled hydropower projects and subsidies to encourage local manufacture of solar panels. The government wants to fix the stressed areas of the power industry such as hydropower, and leverage the massive capacity addition planned in solar power generation from 6.7 gigawatts (GW) at present to 100 GW by 2022, to boost domestic manufacture of panels and equipment. A scheme for providing long-term funds to hydropower projects is being worked out.

The power ministry is also working on a comprehensive policy to encourage hydropower generation. It is also finalizing a policy on financial support for solar power equipment manufacturers, proposed by the NITI Aayog. The amount of subsidy needed to be competitive in the market will be determined through a reverse auction.

Manufacturers receiving subsidy will also get an assured market for supply of panels and equipment for a specified number of years. The scheme will be available for both, existing and new players.

Private power distribution companies will also be enabled to benefit from certain aspects of the Ujwal Discom Assurance Yojana (UDAY), designed for turning around debt-ridden state-run power distributors.
 

← All latest storiesBack to top →