Government to cut graft in EPC road projectsIllustrative image – not actual.

The Union Government is looking at introducing third-party monitoring and electronic payment for road construction projects that are being implemented on EPC basis.

The modifications are part of a new model concession agreement for EPC road projects being prepared by Planning Commission in conjunction with Union Ministry of Road Transport and Highways. The changes are proposed as the government has decided to develop national highways with total length of 20,000 km to two lanes in a time-bound manner in EPC mode. These projects are to be awarded on turnkey basis rather than current item-rate basis. An item-rate contract is one that is awarded based on cost bids for each of the item used in construction of a road. On the other hand, turnkey projects are bid out on the basis of total cost of the project.

Earlier the government was also considering restricting the number of pre-qualified bidders for EPC projects. In September 2011, it invited technical bids for two projects in Uttar Pradesh to test this provision. However, the projects failed to receive adequate bids from private companies and the matter was sent back to the discussion table.

← All latest storiesBack to top →