Illustrative image – not actual.The Prime Minister’s Office (PMO) is
considering the setting up of a Central authority for implementing hydel power
projects in the country, as a precursor to a major hydel power initiative to be
launched soon.
The body would be on the lines of the National
Highways Authority of India that was set up in 1997 for undertaking the
National Highway Development Programme. The proposed authority would have a
simplified structure and will be empowered to accord single-window clearance to
power projects, including the Public Investment Board and environmental
clearance.
Prime Minister, Mr Atal Bihari
Vajpayee, will be launching a 50,000 MW hydel power initiative on 24 May 2003.
The programme would entail preparation of pre-feasibility reports (PFR) for 162
hydro power projects with an installed capacity of 50,560 MW in 16 states.
Central Electricity Authority would be preparing the PFRs. The projects would
be implemented in the Eleventh and Twelfth Plan periods (2007-2017). The
projects would require funds to the tune of Rs.2,25,000 crore comprising
Rs.70,000 crore in the form of equity.
