Illustrative image – not actual.PSL Ltd (formerly PSL Holdings) has bagged a Rs.121 crore order from Hindustan Construction Co (HCC) for the supply of pipes relating to the Godavari Lift Irrigation project.
The order involves an initial supply of 30,000 tonnes (approx 34 km) for supply of 100 inch diameter spiral welded pipes. The supply would be made over the next five months.
The government of Andhra Pradesh is implementing the Godavari Lift Irrigation Scheme for which HCC was appointed EPC contractor.
Related Stories:
HCC bags Godavari Lift Irrigation Scheme order from AP government (12-Jan-04)
