Godavari drinking water scheme faces hurdles Illustrative image – not actual.

The Godavari drinking water scheme of Hyderabad Metropolitan Water Supply & Sewerage Board (HMWSSB) is facing hurdles due to natural rock formation issues. 


The excavation process for master balancing reservoir (MBR) at Ghanpur village, in Shamirpet mandal of Ranga Reddy district is at a standstill as the rock formation has a heritage tag. To break or remove the rocks, the board needs  approval from the Hyderabad Metropolitan Development Authority’s (HMDA's) Heritage Conservation Committee (HCC).


In November 2013, the developer received 50 acre in Ghanpur village from the Ministry of Environment & Forests for construction of the water supply scheme, with a capacity of 150 million gallon per day.


Once the Ghanpur MBR is commissioned, drinking water will be brought to the Ghanpur reservoir from Kodandapur through intermediate pumping stations at Bommakal, Mallaram, and Kondapaka. From the Ghanpur MBR, water will be supplied through two ring mains to surrounding GHMC circles, including Qutubullapur, Malkajgiri, Kapra, Alwal, Kukatpally and Secunderabad Cantonment.


The Godavari drinking water supply scheme intends to supply 172 million gallon per day of Godavari water to the city. It was expected to get commissioned by May 2014 but is now delayed.

 

Related Link:
Project profile

← All latest storiesBack to top →