Illustrative image – not actual.
Work on the long overdue project to activate Goa's two inland waterways to ferry people and tourists will begin from October 2016. The ferry services will link Aldona to Panaji; Cortalim to Durbhat via Panaji; and Panaji to Vasco.
The Ministry of Shipping has prepared a detailed report to plan terminals at various points along the inland waterways. Betim, Brittona, Aldona, Corjuvem, Pomburpa, Durbhat, Old Goa, Panaji, Chorao and Ribander are the likely points for the terminals.
The entire project, which includes dredging, building terminal points along the two inland streams, and construction of jetties to ferry passengers, is estimated to cost Rs 215 crore.
A plan to develop four other rivers — Chapora, Cumbharjua, Mapusa and Sal — is in the pipeline.
