Goa govt. plans pipeline network expansionIllustrative image – not actual.

The Water Resources Department (WRD), Goa plans to undertake a major extension and expansion of the Selaulim-Kalay pipeline network to prevent repeated pipeline bursts.

While the Selaulim dam currently releases 48 million litres per day into the Kalay river, only about 25 to 30 MLD successfully reaches the Opa Water Works due to significant transit wastage. Under the proposed upgrade, the existing 13-km mild steel pipeline will be extended to 31 km. This modification will enable Selaulim water to be discharged directly into the Khandepar river at Opa, bypassing open-river transit losses. Commissioned in 2002, the legacy system utilises four 600 HP pumps at the Selaulim dam campus each summer to rejuvenate the Khandepar river.

The modernised pipeline will improve raw water availability and treatment efficiency for Opa Water Works, and the overhaul aims to secure sustainable, uninterrupted municipal water supplies for the region.

← All latest storiesBack to top →