Illustrative image – not actual.GMR Energy, a subsidiary of GMR Infrastructure has signed a memorandum of understanding (MoU) with the Chhattisgarh government for implementation, operation and maintenance of a 1,000 MW coal based power plant.
GMR is presently in the process of identifying a project site, after evaluating proximity to coal mines and the transmission corridor. The detailed project feasibility study is expected to begin by end-June 2007. The Chhattisgarh government shall provide all necessary assistance towards the development of the project.
As per the terms of MoU, the state is entitled to avail 5 per cent of the net energy annually at variable cost as determined by the appropriate regulatory commission. The state government has the right to purchase upto 30 per cent of power from the project for a period of 20 years through its nominated agency.
