Illustrative image – not actual.The Greater Mohali Area Development Authority (GMADA) has launched a major initiative to connect upcoming residential and urban sectors with a canal-based water supply system to improve long-term water security and urban infrastructure.
The project includes upgrading the Kajouli Pump House, constructing a Phase-II Water Treatment Plant at Singhpur and laying a rising main pipeline up to Mohali. GMADA has also begun appointing consultants to prepare design plans, detailed project reports, tender documents and proof-checking for the scheme. Currently, many developing sectors rely heavily on tubewells, but declining groundwater levels and rapid urban growth have increased the need for a sustainable alternative.
Under the project, canal water from Kajouli Water Works will be treated with modern technology before being supplied to various sectors. The proposed treatment plant at Singhpur is expected to improve both water quality and supply capacity, while the new pipeline will ensure smoother and more reliable distribution. Areas such as Aerocity, IT City Mohali and New Chandigarh are expected to benefit significantly.
The initiative is also likely to reduce summer water shortages, improve pressure levels and decrease dependence on groundwater extraction, supporting environmental conservation and sustainable urban development in the region.
