Illustrative image – not actual.GE Vernova has bagged an order from Megha Engineering & Infrastructures (MEIL) to supply nine 150 MW pumped-storage units for the 1.35 GW Upper Sileru hydro project in Andhra Pradesh.
The works under the contract will support grid stability by switching between pumping and generation modes, helping manage peak demand and improve frequency regulation. GE Vernova will leverage its engineering and manufacturing capabilities in India for execution, contributing to local employment, skill development, and industrial capability enhancement. The project, scheduled for completion by 2030, is set to become one of the largest pumped-storage hydropower installations in India. Once operational, the plant will store and supply electricity equivalent to the annual consumption of around three million Indian households.
The Upper Sileru project is a landmark development for India’s renewable energy infrastructure, reinforcing the country’s focus on long-duration energy storage solutions to support a reliable and flexible power system.
