Illustrative image – not actual.GE Power India has bagged contract from NTPC for its Feroze Gandhi Unchahar Thermal Power Project Stage-I, II and III, five x 210 MW.
The order has been bagged for supply and installation of wet flue gas desulphurisation (FGD) systems for a value of Rs 6,900 million (USD 97 million) with common absorber (combination of multiple boiler units).
This is the first time that GE Power in India has been awarded a project to install common absorber for a combination of multiple boiler units. The project will be located in Unchahar, Uttar Pradesh. It intends to remove SO2 from flue gas generated by coal-fired boilers in the respective plants in order to comply to environmental new emission norms issued.
