Gas pipeline along National Highway in Tamil Nadu unviableIllustrative image – not actual.

The proposal of laying a cross-country pipeline along the National Highway (NH) in Tamil Nadu is technically unviable.

Mecon examined the project in detail who found it technically unviable. The movement of crawler-mounted heavy pipe-laying equipment for construction of pipeline will disrupt traffic movement along the highway for the entire construction period of over a year and damage the highway totally. It will also lead to blockage of highways and may cause law and order problems for the State administration, affecting the State economy and tourism.

Besides, in this stretch, there is no adequate space for pipeline laying along the highway or central divider due to future expansion of road and urbanisation. Besides these, there were technical and geographical issues.Due to rocky terrain along the road, controlled rock blasting will be required wherein traffic will be required to be stopped around 2 km from such blasting locations, which could be a safety issue.

← All latest storiesBack to top →