Illustrative image – not actual.
India's second largest expressway Ganga Expressway in Uttar Pradesh is set to be completed by December 2024. At a current cost of Rs 36,230 crore, the Ganga Expressway will cross 12 districts in the state.
With a total area of about 7,453.15 hectares, the expressway will pass through 518 settlements. Intended as a six-lane expressway, it will eventually be extended to eight lanes with a 120-mtrs. right-of-way width, allowing for a 120 mph speed. There are four phases of construction.
While IRB Infrastructure is constructing the 129.70 km Meerut-Badaun stretch, Adani Infrastructure is building the Badaun-Hardoi (151.70 km), Hardoi-Unnao (155.70 km), and Unnao-Prayagraj (156.85 km) sections. There will be 32 flyovers, seven rail overbridges (ROBs), and 14 significant bridges along the Ganga Expressway. It will also include a 3.5-km airstrip in Shahjahanpur, close to Jalalabad.
This 594-km-long expressway stretching from Bijauli in Meerut to Judapur Dandu in Prayagraj will enhance connectivity between eastern and western Uttar Pradesh and will also give boost to Mahakumbh 2025, as millions of devotees and tourists from around the world will visit the festival.
