Illustrative image – not actual.Gas Authority of India Ltd (GAIL) plans to pick up equity in gas fired power plants being set up at Delhi, Andhra Pradesh and Gujarat or Maharashtra. GAIL has already initiated talks with BSES Ltd in this connection.
GAIL only plans to have a 16-20 per cent equity in the
power projects and gain representation on the board of directors. GAIL does not
pant to operate these power plants.
Meanwhile, GAIL also plans to join the missing links
between the proposed gas grid in southern and eastern Indian and the Hazira-Bijapur-Jagdishpur
(HBJ) pipeline to form a national gas grid of sorts. This would mean connecting
the HBJ pipeline to Uran-Dabhol and ultimately to Mangalore-Bangalore. The
Jamnagar-Luni line would be linked near Patan in Gujarat to the HBJ pipeline
and then extended beyond Jagdishpur to Punjab and Kanpur-Gorakhpur.
There were also talks with Hindustan Petroleum
Corporation to link Visakhapatnam with Secunderabad and Mangalore with
Bangalore with a T – shaped line going to Coimbatore.
