GAIL in talks with GMR, GVK for LNG terminalIllustrative image – not actual.

GAIL is holding talks with GVK Power and Infrastructure and the GMR Group to set up a liquefied natural gas (LNG) terminal.

The terminal with a five million tpa capacity is estimated to cost Rs 4,000 crore.

The proposed JV will ensure the two private sector firms have assured infrastructure for a crucial fuel supply - natural gas. The terminal may be either a floating or an on-land facility and a MoU to this effect may be signed shortly.

Also See:

GAIL plans capex, to raise funds from market (19-January-11)

← All latest storiesBack to top →