Illustrative image – not actual.GAIL (India) Board recently approved doubling the capacity of its Pata petrochemical complex in Uttar Pradesh to 8 lakh tpa.
Now a detailed report will be prepared, based on which the company will work out the investments required for it. The installed polymer capacity at Pata is 4.10 lakh tpa, which will be increased to 8 lakh tpa by leveraging existing facilities and augmenting them.
The board has also given its nod for the submission of EoIs for the Vijayawada-Vijaipur Pipeline (VVP) project to Petroleum & Natural Gas Regulatory Board (P&NGRB). The length of the proposed trunk pipeline will be about 1,000 km and spur line will be over 500 km with a capacity to ferry approximately 30 mmscmd of gas. The starting point of the pipeline will be Vijayawada (Andhra Pradesh) and terminating point is Vijaipur in Madhya Pradesh.
Also See:
GAIL to enhance Pata petrochemical plant's capacity (05-Sep-08)
