Four-lane railway flyover inaugurated on NH-50 near Bidar Illustrative image – not actual.

Union Minister of State for Chemicals & Fertilizers Bhagwant Khuba inaugurated a four-lane railway over bridge (RoB) on the Nanded-Bidar-Chitradurga National Highway near Bidar on 8 March, 2023. The 2.5-km structure is the longest railway overbridge in the state.

The four-lane structure will come up at the intersection of the NH-50 and the Bidar-Kalaburagi state highway to ensure smooth movement of heavy vehicles and trains between Karnataka, Maharashtra and Telangana.

The project which entailed an outlay of Rs 94.6 crore, has been executed by Bidar-based Kollur Gurunath Construction Infrastructure (KGCICL). It was completed in 24 months.

The project has been designed and executed on the basis of the rising number of vehicles and traffic issues projected for the next 15 years. The approaches were built in lieu of the existing level crossing No 48/E at km 66.900 on NH-50 (railway chainage 96/6-7) near Naubad. A 21-acre land parcel was acquired for the purpose.

The facility also has service roads on both sides, and includes features like four-lane viaducts, pipe culverts, box culverts, minor bridges, drains and sidewalls.

← All latest storiesBack to top →