Illustrative image – not actual.
Union Minister for Road Transport & Highways, Shipping and Water Resources, River Development and Ganga Rejuvenation Nitin Gadkari will lay the foundation stone for development of a six-lane, access controlled-corridor from Akshardham in East Delhi to the Eastern Peripheral Expressway junction on Baghpat road on 26 January 2019.
The alignment of the road will be from Akshardham-Geeta Colony-Shastri Park-Khazuri Khas-Delhi/UP border-Mandola-EPE Intersection. The road stretch of 31.3 km is part of NH-709B that will run from Akshardham to Saharanpur Bypass.
The project will be developed in two packages. In the first package a 14.75 km stretch from Akshardham to Delhi/UP border will be developed, while in the second package 16.57 km stretch from Delhi/UP border to EPE Intersection. There will be a 19 km elevated section.
The estimated cost for developing the project is Rs 2,820 crore.
The project will see construction of three+three-lane service roads on either side of the highway, eight new underpasses, seven ramps connecting major roads, 15 major junctions, 34 minor junctions, and over-bridges at Delhi-Shahdara, New Delhi-Anand Vihar railway lines and Dilshad Garden-ISBT Metro Line.
The high-speed, signal-free corridor is expected to decongest Delhi NCR.
