Illustrative image – not actual.The city corporation has laid the foundation stone for a water treatment plant in Manalur, on 4 February. This is part of reviving the Manalur drinking water project.
It is estimated to cost Rs 16.40 crore and the scope of work includes construction of treatment plants and replacement of old worn out pipelines established earlier. The city corporation has sanctioned the funds under integrated urban development mission of the state government.
This project needs to be carried out on three portions. The first portion will see the replacement of 350 mm iron pipes from Thirupuvanam to Manalur Pumping Station with plastic pipes, at a cost of Rs 2.27 crore. In portion two, the civic body will construct treatment plants with five million ltr per day capacity and renovate pumping stations at a cost of Rs 3.70 crore. The third portion of work requires to replace 450 mm iron pipes with plastic pipes from Manalur to Teppakulam at a cost of Rs 10.43 crore.
The work will be carried out in four phases, where water from the Manalur aquifer will be treated and mixed with water drawn from Thirupuvanam aquifers and pumped to an underground sump created in Teppakulam. As much as eight million ltr per day water will be pumped in this manner to Teppakulam sump and then distributed to Melamadai, Vandiyur and Iravathanallur in zone three.
The Manalur drinking water project was established in 1983. Aquifers were sunk in Manalur and Thirupuvanam in Vaigai River Bed and water was drawn from these wells and supplied to Madurai city.
More Project Info:
Water Treatment Plant (Manalur)
